As part of a milk reception drain upgrade for Fonterra Clandeboye, ANDAR was commissioned to design & build a pumping system for transferring waste water from the raw milk reception area to main waste water sump. This included pumps, pipework, instrumentation & a surge tank for high flow events. The pumps were controlled to match the highly variable incoming flow rate.
- Date: July 26, 2013