Fonterra Clandeboye Milk Reception Drain Upgrade

As part of a milk reception drain upgrade for Fonterra Clandeboye, ANDAR was commissioned to design & build a pumping system for transferring waste water from the raw milk reception area to main waste water sump.    This included pumps, pipework, instrumentation & a surge tank for high flow events.    The pumps were controlled to match the highly variable incoming flow rate.

  • Date: July 26, 2013